Monday, November 14, 2011

Uganda’s cellcos fail to meet QoS requirements

Uganda’s wireless operators are all failing to meet minimum quality of service (QoS) requirements, according to a report published by the telecoms watchdog the Uganda Communication Commission (UCC). The UCC survey was carried out between 30 May 2011 and 2 September 2011, and during this period all six operators exceeded the maximum 2% rate of calls blocked or dropped


View post:
OVETEL Uganda’s cellcos fail to meet QoS requirements

No comments:

Post a Comment